CRITICAL PATH RESOLUTIONS LLC
CRITICAL PATH RESOLUTIONS LLC
- USDOT Number
- 5275929
- Docket / MC #
- MC-60666545
- Headquarters
- WASKOM, TX
- Fleet & VINs
- 5 Trucks · 0 VINs
1. Operating Authority & Insurance Filing
Carrier vs. Broker license status, Out-of-Service orders, and BMC-91X auto liability
- Operating Licenses
- Common Carrier: NONEContract Carrier: NONEProperty Broker: NONE
- Enforcement & Revocations
- Out-of-Service: NonePrior Revocations: 0
- BMC-91X Auto Liability
- $0 / No Active Filing
FMCSA filings do not include general freight Motor Truck Cargo limits or policy exclusions. Upload the carrier's ACORD 25 COI on the right to verify Cargo coverage and producer contact lines.
2. Safety Record & Inspected Equipment
24-month SAFER inspection rates, federal crash totals, and VIN-decoded trailer types
Over 90% of active U.S. motor carriers hold no formal FMCSA compliance review rating on file. UNRATED is an administrative status — evaluate 24-month roadside OOS rates and crash records instead.
| 24-Month Inspection Metric | OOS / Inspections | Carrier Rate | U.S. Benchmark |
|---|---|---|---|
| Vehicle OOS (Levels 1, 2, 5, 6) | 0 / 0 | N/A (0 inspections) | 22.3% |
| Driver OOS (Levels 1, 2, 3, 6) | 0 / 0 | N/A (0 inspections) | 6.7% |
3. Company Identity & Physical Footprint
USDOT registration tenure, recent MCS-150 edits, and physical address checks
- Registration Tenure
- Registered 2026-06-02
- Address Verification
- Undeliverable Mail: NoVirtual Mailbox (CMRA): No
- Address Cross-Reference
- USDOTs at Same Address: 1Prior Revoked USDOT: None
Executive Public Baseline Summary
Federal U.S. DOT records currently classify CRITICAL PATH RESOLUTIONS LLC (USDOT 5275929 / MC-60666545) out of Waskom, TX as non-active for interstate for-hire property dispatch (Authority: REGISTERED_INTERSTATE). Shippers and freight brokers reviewing quote packets bearing these identifiers should pause tendering until current federal reinstatement is independently confirmed.
Safety & capacity baseline: The carrier's federal safety rating is UNRATED (No Formal Compliance Audit); zero Level 1/2/5/6 vehicle inspections are on file for the 24-month window, and zero Level 1/2/3/6 driver inspections are on file for the 24-month window. FMCSA Crash File records show 0 reportable crashes over the trailing 24 months.
Observed Fleet Vehicles & Equipment Sample
Roadside-inspected commercial vehicles on file (VIN serial suffix masked publicly)
No vehicle VIN records observed in the trailing 24-month federal roadside inspection history. Require physical tractor VIN verification via a 7-Day Dock Pass before loading.
Federal Insurance Filings & Authority History
Recorded FMCSA primary auto liability, cargo, and broker bond filings
No active federal insurance filings listed in public FMCSA records for this USDOT number.